Our OEM/ODM Process

 

Step 1: Drawing Submission & Engineering Review
Send your CAD/PDF drawings or samples. Our engineering team responds within 24 hours, evaluating feasibility, recommending materials, optimizing design, and ensuring IEC/GB/ANSI compliance. All drawings are strictly confidential. NDA available upon request.

Step 2: Prototype Sampling (7-15 days)
Before mass production, we produce prototype samples for your approval – confirming dimensions, electrical performance, and installation compatibility. Test reports are provided with the sample.

Step 3: Mass Production (20-40 days)
Once the sample is approved, we move to mass production. Our Zhejiang factory has monthly capacity of 20,000+ insulators and 15,000+ transformers, with APG casting lines, CNC machining centers, and full traceability.

Step 4: 100% Factory Testing
Every custom component undergoes rigorous testing:

  • Partial Discharge Test: 100% tested, <10pC (24kV and below) / <20pC (40.5kV)

  • Power Frequency Withstand Test: 100% verification, 1-minute no breakdown

  • X-Ray Inspection: Random sampling for internal defects

  • Dimensional Inspection: 100% check on critical dimensions, precision ±0.5mm

All test reports are provided with your shipment.

 

What We Can Customize

 

  • Insulation Components: Height 130-380mm, creepage distance, material formula, RAL color

  • Transformers: Ratio, accuracy 0.2/0.5/5P, secondary coils, mounting dimensions

  • Surge Arresters: Voltage rating, residual voltage, housing color, mounting bracket

  • Switchgear Parts: Operating mechanism, interlocking, auxiliary contacts, custom dimensions

  •  

Success Stories

  • European customer: Custom 155mm post insulators (standard 170mm) – 3 years stable supply

  • Southeast Asian utility: High creepage bushings (350mm) – 2 years no flashover

  • Middle East EPC: High-temperature contact boxes (130℃) – project approved

 

 

Quality Certifications

Fuyi Switch holds ISO 9001:2015, CE marking, and complies with IEC 60044, IEC 60099, and IEC 60664 standards. Type test reports are available. Batch test reports are provided with every shipment. 18-month warranty offered.

For further details, please contact us.
CONTACT US
Other News
How to Set Up a Medium Voltage Current Transformer for Metering?
Step-by-step guide to correctly install and wire a medium voltage...
May 27,2026
How Often to Inspect Switchgear Contacts for Heat and Corrosion?
Discover how often to inspect switchgear contacts for heat and co...
May 22,2026
OEM/ODM & Quality Control
Standard components don't always fit every application. Non-stand...
Apr 17,2026
GET IN TOUCH NOW
Captcha Code